
2. UNPACKING AND ASSEMBLING
Instruction manual CM 121
8
figure 1. the different parts of the shadow ring CM 121B
1 sector (including sight)
2 scale on the sliding bar (point of readout is indicated)
3 crossbar
4 securing bolt for the crossbar to the pyranometer support
5 shadow ring
6 pyranometer (normally not included in delivery)
7 spirit level of the pyranometer
8 pyranometer support
9 screws for attachment of the sliding bar to the shadow ring
10 fixing screws for the sliding bars
11 sliding bar
12 pillar
13 base
14 leveling screw for the base
Komentarze do niniejszej Instrukcji